![]() ![]() We plumb the system with a quick union disconnect so that the submersible pump can be removed from the tank for service, repair, or replacement. Risers are available to bring the access of the lift station to grade. Our Complete Pump Stations requires very minimal maintenance costs, minimal annual electric costs, and no modifcations to the household plumbing. A low-profile Polyethylene cover protects access to the collection tank. HOMEOWNER FRIENDLYĭesigned for residential use, our Complete Pump Stations offer a unique blend of performance, aesthetics, safety, and ease of use. Our Complete Pump Stations are very easy to install and have been designed to significantly reudce installation time. It pumps the sewage up to the main sewer or septic line, ensuring that all waste is effectively directed out of the home. This eliminates costly guesswork during installation. On the other hand, a sewage ejector pump is a larger, more robust system designed to handle not just the output of a toilet, but also wastewater from other fixtures such as sinks and showers. ![]() Our Fiberglass Lift Stations are shipped from Septic Solutions' warehouse facility fully assembled and ready to install. See the advantages of buying your sewage or effluent lift station from Septic Solutions: Our duplex pump stations include two submersible sewage or effluent pumps. Plus, ejector pumps are typically used for uphill pumping, is downhill pumping allowed? Note that, as the 2 inch line nears the septic system, the ground levels off and may go slightly uphill so a pump is necessary.Our simplex pump stations include a single submersible sewage or effluent pump. ![]() I've found no reference to plumbing code that would address this situation (two buildings joining to one septic tank, either by gravity feed or ejector pump). This extra work is making me think that I might be better off installing a sewage ejector pump just outside the workshop, run a 2 inch flex line around the perimeter of the lawn (total length would be approximately 200 feet) and join the septic 4 inch line between the house and the septic tank. 1/2 HP max flow rate is 10000 Gallons Per Hour 7200 GPH at 10 ft of discharge lift. Install this pump to either a 2' or a 3' NPT discharge pipe. ![]() This pump is assembled in the USA to deliver dependable performance that lasts for years. Given these conditions, plan A was to trench and run the waste line from the workshop to the house foundation, cut through the foundation, and join up with the waste lines in the house crawlspace - using 3 inch waste line.ĪHJ says that we need to switch to 4 inch pipe once we're more than 10 feet from the workshop foundation forcing us to Plan B which would run 3 inch out of the workshop, join a 4 inch to run to the workshop side of the house, run the 4 inch line through the full length of the crawlspace, convert the lowest point of the waste lines in the house to four inch, including where it exits the house and joins the septic line, and join the workshop 4 inch line to the house 4 inch line near the house waste exit. Wayne1/2-HP 120-Volt Thermoplastic Sewage Sump Pump. The pump stations offered by Septic Solutions can be used for residential, commercial. 500 Gallon Pump Station with 1.0 HP Liberty Sewage Ejector Pump. These pumps help move sewage waste into the main septic line. The septic tank and workshop are on opposite sides of the house and the workshop is about 5-6 feet in elevation above the house main floor and about 10 feet above the elevation of the ground level at the septic tank. 500 Gallon - Our simplex pump systems can be utilized as residential lift stations and also in light commercial applications. Homes with basement laundry or bathroom facilities need a sewage ejector pump. The workshop is located about 75 from the existing house, which has a septic tank system. I am building a workshop with a half bath (two sinks and a WC). ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |